The most important rule for an electrical testing company is disconnecting installations from all live power before testing. Other critical rules include:

  • Securing against reconnection during testing
  • Verifying that the power is off before beginning work
  • Grounding and short-circuiting all devices
  • Isolating live areas to prevent accidental contact.